Zabelina 3, p.1
Object area: 1500m2. Cultural heritage site.
SOLTECH acts as a general contractor:
– A set of works to ensure waterproofing of the basement floor. (shut-off waterproofing, injection without dismantling the foundation)
– Strengthening load-bearing structures
– Dismantling of walls and partitions in accordance with the new layout of the premises
– Construction of new walls, openings and partitions
– Restoration of decorative elements of the ceiling
– Installation of internal engineering systems (water supply, conditioning, ventilation, heating, sewage)
– Finishing work in accordance with the design project

